County Approves Farmersville Solar Road Agreement and Two Bridge Repair Projects
Montgomery County Board Meeting | March 10, 2026
Article Summary: The Montgomery County Board approved a formal road use agreement with CF Farmersville Solar to utilize Main Street for construction access, while also greenlighting over $120,000 in local bridge engineering and repair work.
Infrastructure & Road Agreements Key Points:
-
CF Farmersville Solar will use approximately one mile of Main Street (Mine Ave.) to construct a new solar farm, backing the agreement with a $250,000 surety bond.
-
The Board approved a $60,895 engineering agreement with Hurst-Rosche for a bridge replacement on North 15th Ave in Butler Grove Township.
-
The Board appropriated funds for a $60,000 pile repair project on Red Bridge Trail in Hillsboro Township.
The Montgomery County Board on Tuesday, March 10, 2026, approved a comprehensive road use agreement with a commercial solar developer and advanced two significant bridge repair projects.
The Board unanimously approved an agreement with CF IL Solar W. Main St., Farmersville LLC (CF Farmersville Solar), granting the developer the right to use approximately one mile of Main Street (Mine Ave.) to access a proposed solar farm location during construction.
Roads and Bridges Committee Chairman Ethan Murzynski presented the agreement, noting that it explicitly outlines the size and location of the entrance culvert and the entrance road, as well as the developer’s responsibilities regarding the use and upkeep of the road.
According to the terms of the contract provided in the agenda packet, the maximum weight limit on Main Street will be restricted to 80,000 pounds. CF Farmersville Solar is strictly prohibited from using the county right-of-way for storage, staging, or parking. To protect the county’s infrastructure, the developer is required to post a $250,000 surety bond prior to construction, which the county can draw against if the company fails to pay for any necessary road repairs or restoration. Any unauthorized use of non-designated county roads by construction vehicles will result in a $500 fine per occurrence.
In addition to the solar agreement, the Board approved two local bridge initiatives.
The Board approved a $60,895 engineering agreement with Hillsboro-based Hurst-Rosche Inc. for the replacement of a bridge on North 15th Ave. in Butler Grove Township. Murzynski stated the project (Section 26-03115-00-BR) will replace an existing wood deck bridge with a new drainage structure, alongside local channel improvements and roadway upgrades. The project will be funded 80% by the Township Bridge Fund and 20% by local funds.
The Board also approved Resolution 2026-05, appropriating funds for a 50/50 bridge pile repair project on Red Bridge Trail in Hillsboro Township. Murzynski informed the board that the bridge is currently closed due to a state of severe deterioration. The total cost of the repair is estimated at
60,000,withMontgomeryCountyandtheHillsboroTownshipRoadDistricteachresponsibleforhalfofthecost(
30,000) via the County Aid to Bridge Fund.
Latest News Stories
Wild’s Extra-Inning RBI Secures Walk-Off 1-0 Victory for Lena-Winslow Over Litchfield
Litchfield Council Approves Residential Demolitions and Emergency Roof Grant for Downtown Business
Pana Offense Erupts for 18 Hits, Uses Five-Run Fifth to Put Away Litchfield 11-6
Malisia’s Complete Game Not Enough as Pana Falls to Litchfield 3-1
Litchfield Firefighter Wins 9th Annual Mustache Contest, Secures $500 for Department
Girard Man Arrested by State Police on Child Sexual Abuse Material Charges
Litchfield Previews FY 2027 Budget Featuring $19.5 Million in Capital Projects and Fund Consolidations
WATCH: California probe ends $267M in alleged hospice fraud
Ex-Blago attorney: Quid pro quo is key to Madigan appeal
Illinois Quick Hits: House GOP says no Bears deal without property tax reform
Melania Trump denies any relationship with Jeffrey Epstein
War Powers Resolution halting Trump’s Iran ambitions fails in U.S. House