montgomery county Graphic Logo.2

County Approves Farmersville Solar Road Agreement and Two Bridge Repair Projects

Montgomery County Board Meeting | March 10, 2026

Article Summary: The Montgomery County Board approved a formal road use agreement with CF Farmersville Solar to utilize Main Street for construction access, while also greenlighting over $120,000 in local bridge engineering and repair work.

Infrastructure & Road Agreements Key Points:

  • CF Farmersville Solar will use approximately one mile of Main Street (Mine Ave.) to construct a new solar farm, backing the agreement with a $250,000 surety bond.

  • The Board approved a $60,895 engineering agreement with Hurst-Rosche for a bridge replacement on North 15th Ave in Butler Grove Township.

  • The Board appropriated funds for a $60,000 pile repair project on Red Bridge Trail in Hillsboro Township.

The Montgomery County Board on Tuesday, March 10, 2026, approved a comprehensive road use agreement with a commercial solar developer and advanced two significant bridge repair projects.

The Board unanimously approved an agreement with CF IL Solar W. Main St., Farmersville LLC (CF Farmersville Solar), granting the developer the right to use approximately one mile of Main Street (Mine Ave.) to access a proposed solar farm location during construction.

Roads and Bridges Committee Chairman Ethan Murzynski presented the agreement, noting that it explicitly outlines the size and location of the entrance culvert and the entrance road, as well as the developer’s responsibilities regarding the use and upkeep of the road.

According to the terms of the contract provided in the agenda packet, the maximum weight limit on Main Street will be restricted to 80,000 pounds. CF Farmersville Solar is strictly prohibited from using the county right-of-way for storage, staging, or parking. To protect the county’s infrastructure, the developer is required to post a $250,000 surety bond prior to construction, which the county can draw against if the company fails to pay for any necessary road repairs or restoration. Any unauthorized use of non-designated county roads by construction vehicles will result in a $500 fine per occurrence.

In addition to the solar agreement, the Board approved two local bridge initiatives.

The Board approved a $60,895 engineering agreement with Hillsboro-based Hurst-Rosche Inc. for the replacement of a bridge on North 15th Ave. in Butler Grove Township. Murzynski stated the project (Section 26-03115-00-BR) will replace an existing wood deck bridge with a new drainage structure, alongside local channel improvements and roadway upgrades. The project will be funded 80% by the Township Bridge Fund and 20% by local funds.

The Board also approved Resolution 2026-05, appropriating funds for a 50/50 bridge pile repair project on Red Bridge Trail in Hillsboro Township. Murzynski informed the board that the bridge is currently closed due to a state of severe deterioration. The total cost of the repair is estimated at

60,000,withMontgomeryCountyandtheHillsboroTownshipRoadDistricteachresponsibleforhalfofthecost(

30,000) via the County Aid to Bridge Fund.

Leave a Comment





Latest News Stories

montgomery county Graphic Logo

County Engineer Raises Concerns Over “Irresponsible” Bridge Contractor

Montgomery County Board Meeting | December 9, 2025 Article Summary: The Montgomery County Board and its Roads & Bridges Committee addressed serious performance issues regarding a contractor currently working on...
montgomery county Graphic Logo.2

Board Approves New Labor Contracts for Circuit Clerk, Assessment Employees

Montgomery County Board Meeting | December 9, 2025 Article Summary: The Montgomery County Board approved two new collective bargaining agreements covering employees in the Circuit Clerk’s and Supervisor of Assessments’...
Litchfield Park-Graphic Logo.4

Litchfield Park District Weighs Contracting Concrete Work for Facility Upgrades

Litchfield Park District Meeting | Jan. 7, 2026 Article Summary: The Litchfield Park District Board of Commissioners discussed infrastructure updates during their January meeting, specifically regarding delays with the new...
Meeting Briefs

Meeting Summary and Briefs: City of Litchfield for January 6, 2026

City of Litchfield Meeting | January 6, 2026 The Litchfield City Council met on Tuesday, January 6, 2026, for a session dominated by infrastructure and traffic concerns. The council rejected...
Retirements and resignations to impact midterms as balance of power at stake

Retirements and resignations to impact midterms as balance of power at stake

By Andrew RiceThe Center Square Over the past several months, politicians once regarded as central to their party have bowed out of reelection campaigns or resigned from their positions altogether....
U.S. Supreme Court to hear anti-oil cases with energy costs on the line

U.S. Supreme Court to hear anti-oil cases with energy costs on the line

By Andrew RiceThe Center Square Energy advocates have been warning against green energy demands driving up prices across the country. As anti-oil and gas activists seek legal pathways to straddle...
Constitutional concerns raised over Illinois' first civil hate crime case

Constitutional concerns raised over Illinois’ first civil hate crime case

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – A former Illinois attorney general candidate says the state’s first civil hate crime lawsuit, while based...
Litchfield Logo Graphic.4

Residents Voice Frustrations Over Oil and Chip Street Conditions

City of Litchfield Meeting | January 6, 2026 Article Summary: Several residents approached the Litchfield City Council to complain about the poor condition of streets following recent oil and chip...
Newsom predicts smaller budget shortfall than state agency

Newsom predicts smaller budget shortfall than state agency

By Madeline ShannonThe Center Square In his proposed budget, California Gov. Gavin Newsom is predicting a shortfall of $2.9 billion. That's much less than the $18 billion shortfall projected by...
Colorado ordered to pay $5.4M after abortion law blocked

Colorado ordered to pay $5.4M after abortion law blocked

By Elyse ApelThe Center Square Colorado must pay back legal fees after it was sued for a law banning abortion pill reversals, a federal court ruled this week. The state...
Four Republicans certified for primary to take on Pritzker

Four Republicans certified for primary to take on Pritzker

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – The Republican primary election for who will take on Gov. J.B. Pritzker in November is set. Democrats...
Illinois quick hits: State sues over frozen funds; Nicor Gas seeks rate hike

Illinois quick hits: State sues over frozen funds; Nicor Gas seeks rate hike

By Jim Talamonti | The Center SquareThe Center Square State sues over frozen funds Illinois is one of five states suing the Trump administration over a freeze of more than...
Treasury, IRS ramp up investigation into Minnesota fraud

Treasury, IRS ramp up investigation into Minnesota fraud

By Morgan SweeneyThe Center Square The administration continues to ramp up its response to the massive social services fraud in Minnesota, with Treasury Secretary Scott Bessent enumerating steps his department...
Tariff authority decision still awaited from Supreme Court

Tariff authority decision still awaited from Supreme Court

By Brett RowlandThe Center Square Tariff authority by second-term Republican President Donald Trump was not decided by the U.S. Supreme Court on Friday, meaning the federal government can continue to...
Minneapolis schools offer remote learning while ICE operations continue

Minneapolis schools offer remote learning while ICE operations continue

By J.D. DavidsonThe Center Square Minneapolis Public Schools can choose remote learning for at least a month in the wake of the shooting of Renee Good by an ICE officer...