Litchfield Logo Graphic.3

Litchfield Advances $23 Million Sewer Overhaul and Approves $112,000 in Emergency Water Plant Repairs

Litchfield City Council Meeting | April 2, 2026

Article Summary: The Litchfield City Council moved forward with massive infrastructure planning for its water and wastewater facilities while approving emergency expenditures to address catastrophic failures at the water treatment plant.

Litchfield Infrastructure Key Points:

  • Approved $112,699.03 in emergency repairs for the water plant, including a new PAC silo and security system, waiving competitive bidding.

  • CMT Engineering outlined a $22 to $23 million rehabilitation of the aging wastewater treatment plant, targeting state loans and principal forgiveness.

  • Water clarifiers have been cleaned and filters rebuilt, leading to immediate and noticeable water quality improvements.

  • New 8-inch water lines and a water tower cleaning are underway to address ongoing distribution and quality issues.

The Litchfield City Council on Thursday, April 2, 2026, tackled a series of critical infrastructure hurdles, unanimously approving emergency expenditures for the city’s water treatment plant while previewing a massive $23 million overhaul of the wastewater facility.

The emergency water plant repairs come after what the city’s administration described in agenda documents as a “catastrophic failure of its chemical feed system.” After site visits from both CMT Engineering and HMG Engineering, a voluminous list of immediate corrections was identified.

Alderman Bob Garcia motioned to waive customary bidding procedures to authorize $112,699.03 in emergency fixes. The expenditures include $83,343.00 for a Powered Activated Carbon (PAC) Silo, $4,446.20 for Chlorination and Ammonia Emergency Close Systems, and $24,909.83 for a comprehensive water plant security and access control system to be installed by Heart Technologies.

Christie from CMT Engineering provided an encouraging update on the water plant’s ongoing recovery. A Request for Proposals (RFP) for contract operations is currently out, with vendors touring the facility. Meanwhile, critical deferred maintenance is finally being addressed. Both clarifiers have been completely cleaned out, and the rehabilitation of three filters—comprised of sand and granular activated carbon—is underway.

The results are already visible. “The water after the clarifiers actually had a turbidity that was below the finished water level,” Christie told the council, noting the dramatic reduction of particles in the water. She added that the plant staff’s morale has skyrocketed as they receive proper training on troubleshooting and system functions. “The sense of pride in ownership that’s going on out there is just leaps and bounds from where it was.”

On the distribution side, the city is advancing a $1.5 million water project on the west side of the railroad tracks, funded by a grant, alongside a $2.2 million project to reroute an 8-inch water line on the east side of the lake. A comprehensive cleaning of the water tower is also imminent, which officials hope will further decrease resident complaints regarding water quality.

Simultaneously, the city is racing against the clock to secure funding for a massive overhaul of its wastewater treatment plant, which has reached the end of its extended life. The $22 to $23 million project will heavily focus on replacing deteriorating mechanical components while preserving the structurally sound concrete basins to save costs.

“At a wastewater plant, everything is concrete because the wastewater is corrosive. The structures have like a 50-to-100-year life expectancy. It’s the mechanical components that have that 20-year life expectancy,” Christie explained to the council. “The most economical infrastructure that you have is what you’ve already used and paid for.”

To fund the wastewater overhaul, Litchfield is preparing an application for the State Revolving Fund (SRF) loan program. The city is aggressively pushing to finalize designs and secure necessary construction permits to be placed on the state’s “intended use” list by July 1. Achieving this status is highly competitive but critical, as it opens the door to “principal forgiveness”—the EPA equivalent of grant money based on the city’s median household income.

“We don’t want to lose that principal forgiveness,” Christie emphasized, warning that missing the fiscal cycle could force the city to compete against a different pool of projects the following year with no guarantee of the same financial assistance.

The council will consider an engineering design contract at its next meeting to ensure the project meets the strict state deadlines.

Leave a Comment





Latest News Stories

Meeting Briefs

Meeting Summary and Briefs: Montgomery County Board for October 14, 2025

Montgomery County Board Meeting | October 14, 2025 Overall Meeting SummaryThe Montgomery County Board’s October meeting was marked by significant financial and personnel developments. The meeting began with the acceptance...
OLYMPUS DIGITAL CAMERA

Litchfield School Board Sets Truth in Taxation Hearing, Estimates 9% Levy Increase

Litchfield CUSD 12 Meeting | November 18, 2025 Article Summary: The Litchfield Community Unit School District No. 12 Board of Education has approved a tentative tax levy that estimates a...
montgomery county Graphic Logo

Construction Quality and Insurance Rates Addressed by County Board

Montgomery County Board Meeting | October 14, 2025 Article Summary: Following a builder's complaint about workmanship at the new Highway Department facility, officials assured the public that final payments are...
solar panels photovoltaics in solar farm

Board Doubles Solar and Wind Application Fees, Rejects No-Bid Land Deal

Montgomery County Board Meeting | October 14, 2025 Article Summary: The County Board approved significant fee increases for solar and wind energy applications and rejected a land purchase option from...
Meeting Briefs

Meeting Summary and Briefs: Litchfield Park District Board for Nov. 5, 2025

Litchfield Park District Board Meeting | Nov. 5, 2025 The Litchfield Park District Board met on Wednesday, November 5, 2025, to conduct its regular monthly business. The board authorized a...
Meeting Briefs

Meeting Summary and Briefs: Litchfield City Council for Nov. 6, 2025

Litchfield City Council Meeting | Nov. 6, 2025 The Litchfield City Council met on Thursday, Nov. 6, 2025, addressing critical infrastructure needs and economic development. The meeting was headlined by...
montgomery county Graphic Logo.4

Affrunti Resigns as State’s Attorney; Board Appoints Brian Shaw as Successor

Montgomery County Board Meeting | October 14, 2025 Article Summary: Montgomery County State’s Attorney Andrew Affrunti has resigned, and the board has appointed First Assistant Brian Shaw to fill the...
Litchfield Logo Graphic.4

City Restructures Finance Department, Hires Consultant and New Coordinator

Litchfield City Council Meeting | Nov. 6, 2025 Article Summary: The City Council approved a restructuring of its finance department, creating a new internal coordinator position, moving the Deputy Clerk...
Litchfield Park-Plummer Park Graphic Logo

Trunk or Treat Draws Over 1,000 Attendees

Litchfield Park District Board Meeting | Nov. 5, 2025 Article Summary: The Park District's annual Trunk or Treat event saw massive turnout, prompting officials to plan for increased food supplies...
montgomery county Graphic Logo.2

Budget Error Erases Surplus, Creates $920,000 Deficit for Montgomery County

Montgomery County Board Meeting | October 14, 2025 Article Summary: A clerical error discovered in the tentative budget has transformed a projected surplus into a near-million-dollar deficit. The County Board...
Litchfield Logo.1

City Clarifies State-Mandated Lead Service Line Letters

Litchfield City Council Meeting | Nov. 6, 2025 Article Summary: City officials addressed confusion regarding recent letters sent to residents about lead and galvanized water service lines. The notices were...
Litchfield Park-Pool Graphic Logo

Pool Reports $26,500 Loss as District Plans for Repairs

Litchfield Park District Board Meeting | Nov. 5, 2025 Article Summary: The Litchfield Park District pool concluded its season with a significant financial loss due to unexpected repairs, and now...
Litchfield Logo Graphic.3

Litchfield Secures Marshalls Department Store with New TIF Agreement

Litchfield City Council Meeting | Nov. 6, 2025 Article Summary: The City Council approved a new development agreement that paves the way for a Marshalls department store to open in...
Litchfield Park-Schalk Park Graphic Logo

LBI Proposes Expansion of Schalk Field at Park Board Meeting

Litchfield Park District Board Meeting | Nov. 5, 2025 Article Summary: Representatives from Litchfield Baseball Inc. (LBI) presented a proposal to the Park Board to expand Schalk Field by up...
Litchfield Logo Graphic.4

Litchfield Approves $397k for Emergency Water Plant Repairs; Resident Donates $100k to Cause

Litchfield City Council Meeting | Nov. 6, 2025 Article Summary: The Litchfield City Council authorized nearly $400,000 in emergency expenditures to fix a catastrophic failure at the water treatment plant,...