Litchfield Logo Graphic.3

Litchfield Advances $23 Million Sewer Overhaul and Approves $112,000 in Emergency Water Plant Repairs

Litchfield City Council Meeting | April 2, 2026

Article Summary: The Litchfield City Council moved forward with massive infrastructure planning for its water and wastewater facilities while approving emergency expenditures to address catastrophic failures at the water treatment plant.

Litchfield Infrastructure Key Points:

  • Approved $112,699.03 in emergency repairs for the water plant, including a new PAC silo and security system, waiving competitive bidding.

  • CMT Engineering outlined a $22 to $23 million rehabilitation of the aging wastewater treatment plant, targeting state loans and principal forgiveness.

  • Water clarifiers have been cleaned and filters rebuilt, leading to immediate and noticeable water quality improvements.

  • New 8-inch water lines and a water tower cleaning are underway to address ongoing distribution and quality issues.

The Litchfield City Council on Thursday, April 2, 2026, tackled a series of critical infrastructure hurdles, unanimously approving emergency expenditures for the city’s water treatment plant while previewing a massive $23 million overhaul of the wastewater facility.

The emergency water plant repairs come after what the city’s administration described in agenda documents as a “catastrophic failure of its chemical feed system.” After site visits from both CMT Engineering and HMG Engineering, a voluminous list of immediate corrections was identified.

Alderman Bob Garcia motioned to waive customary bidding procedures to authorize $112,699.03 in emergency fixes. The expenditures include $83,343.00 for a Powered Activated Carbon (PAC) Silo, $4,446.20 for Chlorination and Ammonia Emergency Close Systems, and $24,909.83 for a comprehensive water plant security and access control system to be installed by Heart Technologies.

Christie from CMT Engineering provided an encouraging update on the water plant’s ongoing recovery. A Request for Proposals (RFP) for contract operations is currently out, with vendors touring the facility. Meanwhile, critical deferred maintenance is finally being addressed. Both clarifiers have been completely cleaned out, and the rehabilitation of three filters—comprised of sand and granular activated carbon—is underway.

The results are already visible. “The water after the clarifiers actually had a turbidity that was below the finished water level,” Christie told the council, noting the dramatic reduction of particles in the water. She added that the plant staff’s morale has skyrocketed as they receive proper training on troubleshooting and system functions. “The sense of pride in ownership that’s going on out there is just leaps and bounds from where it was.”

On the distribution side, the city is advancing a $1.5 million water project on the west side of the railroad tracks, funded by a grant, alongside a $2.2 million project to reroute an 8-inch water line on the east side of the lake. A comprehensive cleaning of the water tower is also imminent, which officials hope will further decrease resident complaints regarding water quality.

Simultaneously, the city is racing against the clock to secure funding for a massive overhaul of its wastewater treatment plant, which has reached the end of its extended life. The $22 to $23 million project will heavily focus on replacing deteriorating mechanical components while preserving the structurally sound concrete basins to save costs.

“At a wastewater plant, everything is concrete because the wastewater is corrosive. The structures have like a 50-to-100-year life expectancy. It’s the mechanical components that have that 20-year life expectancy,” Christie explained to the council. “The most economical infrastructure that you have is what you’ve already used and paid for.”

To fund the wastewater overhaul, Litchfield is preparing an application for the State Revolving Fund (SRF) loan program. The city is aggressively pushing to finalize designs and secure necessary construction permits to be placed on the state’s “intended use” list by July 1. Achieving this status is highly competitive but critical, as it opens the door to “principal forgiveness”—the EPA equivalent of grant money based on the city’s median household income.

“We don’t want to lose that principal forgiveness,” Christie emphasized, warning that missing the fiscal cycle could force the city to compete against a different pool of projects the following year with no guarantee of the same financial assistance.

The council will consider an engineering design contract at its next meeting to ensure the project meets the strict state deadlines.

Leave a Comment





Latest News Stories

DeWine defends fraud safeguards at Ohio child care facilities

DeWine defends fraud safeguards at Ohio child care facilities

By J.D. DavidsonThe Center Square Ohio Gov. Mike DeWine is defending the state’s child care spending, saying longtime safeguards are in place that help prevent widespread fraud uncovered in Minnesota....
Illinois quick hits: State keeps more tax revenue, locals get less

Illinois quick hits: State keeps more tax revenue, locals get less

By Jim Talamonti | The Center SquareThe Center Square State keeps more tax revenue, locals get less Across Illinois, local governments have lost more than $10.9 billion in state income...
U.S. House contests to decide control of Congress in 2026

U.S. House contests to decide control of Congress in 2026

By Andrew RiceThe Center Square The 2026 midterm elections promise to bring fierce competition as Democrats and Republicans battle for control of Congress. All 435 seats in the U.S. House...
'Locked and loaded':Trump warns Iran

‘Locked and loaded’:Trump warns Iran

By Sarah Roderick-FitchThe Center Square Following days of civil unrest in Iran, President Donald Trump issued a warning to the Iranian regime that the U.S. is prepared to take action...
First negotiated Medicare drug prices go into effect Jan. 1

First negotiated Medicare drug prices go into effect Jan. 1

By Morgan SweeneyThe Center Square Negotiated lower Medicare costs for 10 popular prescription drugs went into effect Thursday. How much those savings will be passed on to Medicare Part D...
U.S. House vote on employee bargaining met with ‘political theater’ criticism

U.S. House vote on employee bargaining met with ‘political theater’ criticism

By Catrina BarkerThe Center Square )The Center Square) – An Illinois congressman praised a vote to restore collective bargaining for over one million federal workers while critics say the U.S....
Eight killed in U.S. military counter-narcotics strikes

Eight killed in U.S. military counter-narcotics strikes

By Elyse ApelThe Center Square The U.S. military conducted five more strikes on drug boats in the Caribbean in the last days of 2025. This is according to the U.S....
Hog producer: 2025 was strong, but IL legislature needs to address estate tax

Hog producer: 2025 was strong, but IL legislature needs to address estate tax

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – An Illinois hog producer says 2025 was a strong year, but state lawmakers need to address estate...
Trump to remove National Guard members from Chicago, LA, Portland

Trump to remove National Guard members from Chicago, LA, Portland

By Sarah Roderick-Fitch | The Center SquareThe Center Square (The Center Square) – National Guard members deployed in Chicago, Los Angeles, and Portland, Ore., will head home after President Donald...
Illinois’ compact fluorescent bulb ban begins to take effect

Illinois’ compact fluorescent bulb ban begins to take effect

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – One of the nearly 300 new laws that took effect in Illinois New Year’s Day is a...
Illinois quick hits: SBA sues Chicago over online betting tax

Illinois quick hits: SBA sues Chicago over online betting tax

By Jim Talamonti | The Center SquareThe Center Square Illinois to receive rural health-care funding The federal government has awarded Illinois $193.4 million per year for five years to expand...
Illinois Congressman: Millions face higher premiums despite GOP health bill

Illinois Congressman: Millions face higher premiums despite GOP health bill

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Although the U.S. House passed Republicans' “Lower Health Care Premiums for All Americans Act” before leaving...
Jan. 1 law lets Illinois veterinarians skip rabies shots for at-risk pets

Jan. 1 law lets Illinois veterinarians skip rabies shots for at-risk pets

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – A new Illinois law taking effect Jan. 1 will let veterinarians renew yearly medical exemptions for...
Chicago school board raises tax levy on families 'at a breaking point'

Chicago school board raises tax levy on families ‘at a breaking point’

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Chicago Board of Education has raised its property tax levy to fund Chicago Public Schools, but...
Lake Co. Circuit Clerk can’t undo $2.5M verdict for workers fired over politics

Lake Co. Circuit Clerk can’t undo $2.5M verdict for workers fired over politics

By Scott Holland | Legal NewslineThe Center Square A federal judge has agreed to preserve a jury’s verdict ordering the Lake County Circuit Clerk’s Office to pay more than $2.5...