Litchfield Logo Graphic.3

Litchfield Advances $23 Million Sewer Overhaul and Approves $112,000 in Emergency Water Plant Repairs

Litchfield City Council Meeting | April 2, 2026

Article Summary: The Litchfield City Council moved forward with massive infrastructure planning for its water and wastewater facilities while approving emergency expenditures to address catastrophic failures at the water treatment plant.

Litchfield Infrastructure Key Points:

  • Approved $112,699.03 in emergency repairs for the water plant, including a new PAC silo and security system, waiving competitive bidding.

  • CMT Engineering outlined a $22 to $23 million rehabilitation of the aging wastewater treatment plant, targeting state loans and principal forgiveness.

  • Water clarifiers have been cleaned and filters rebuilt, leading to immediate and noticeable water quality improvements.

  • New 8-inch water lines and a water tower cleaning are underway to address ongoing distribution and quality issues.

The Litchfield City Council on Thursday, April 2, 2026, tackled a series of critical infrastructure hurdles, unanimously approving emergency expenditures for the city’s water treatment plant while previewing a massive $23 million overhaul of the wastewater facility.

The emergency water plant repairs come after what the city’s administration described in agenda documents as a “catastrophic failure of its chemical feed system.” After site visits from both CMT Engineering and HMG Engineering, a voluminous list of immediate corrections was identified.

Alderman Bob Garcia motioned to waive customary bidding procedures to authorize $112,699.03 in emergency fixes. The expenditures include $83,343.00 for a Powered Activated Carbon (PAC) Silo, $4,446.20 for Chlorination and Ammonia Emergency Close Systems, and $24,909.83 for a comprehensive water plant security and access control system to be installed by Heart Technologies.

Christie from CMT Engineering provided an encouraging update on the water plant’s ongoing recovery. A Request for Proposals (RFP) for contract operations is currently out, with vendors touring the facility. Meanwhile, critical deferred maintenance is finally being addressed. Both clarifiers have been completely cleaned out, and the rehabilitation of three filters—comprised of sand and granular activated carbon—is underway.

The results are already visible. “The water after the clarifiers actually had a turbidity that was below the finished water level,” Christie told the council, noting the dramatic reduction of particles in the water. She added that the plant staff’s morale has skyrocketed as they receive proper training on troubleshooting and system functions. “The sense of pride in ownership that’s going on out there is just leaps and bounds from where it was.”

On the distribution side, the city is advancing a $1.5 million water project on the west side of the railroad tracks, funded by a grant, alongside a $2.2 million project to reroute an 8-inch water line on the east side of the lake. A comprehensive cleaning of the water tower is also imminent, which officials hope will further decrease resident complaints regarding water quality.

Simultaneously, the city is racing against the clock to secure funding for a massive overhaul of its wastewater treatment plant, which has reached the end of its extended life. The $22 to $23 million project will heavily focus on replacing deteriorating mechanical components while preserving the structurally sound concrete basins to save costs.

“At a wastewater plant, everything is concrete because the wastewater is corrosive. The structures have like a 50-to-100-year life expectancy. It’s the mechanical components that have that 20-year life expectancy,” Christie explained to the council. “The most economical infrastructure that you have is what you’ve already used and paid for.”

To fund the wastewater overhaul, Litchfield is preparing an application for the State Revolving Fund (SRF) loan program. The city is aggressively pushing to finalize designs and secure necessary construction permits to be placed on the state’s “intended use” list by July 1. Achieving this status is highly competitive but critical, as it opens the door to “principal forgiveness”—the EPA equivalent of grant money based on the city’s median household income.

“We don’t want to lose that principal forgiveness,” Christie emphasized, warning that missing the fiscal cycle could force the city to compete against a different pool of projects the following year with no guarantee of the same financial assistance.

The council will consider an engineering design contract at its next meeting to ensure the project meets the strict state deadlines.

Leave a Comment





Latest News Stories

Minneapolis seeks federal aid as Operation Metro Surge ends

Minneapolis seeks federal aid as Operation Metro Surge ends

By Elyse ApelThe Center Square As Operation Metro Surge is expected to wind down in the coming week, the City of Minneapolis is seeking financial assistance from the federal government...
Ongoing smuggling operations continue at U.S.-Canada border

Ongoing smuggling operations continue at U.S.-Canada border

By Bethany BlankleyThe Center Square Ongoing smuggling operations continue at the U.S.-Canada border. After alleged offenders are arrested and charged by federal immigration officers, they are being indicted and prosecuted....
Groups call on Canada to safeguard national security, combat expansive crime

Groups call on Canada to safeguard national security, combat expansive crime

By Bethany BlankleyThe Center Square Two Canadian groups have called on the Canadian government to strengthen border security, highlighting failures to crack down on drug trafficking and illicit trade. While...
montgomery county Graphic Logo.2

County Donates $30,000 for Urgent Electrical Repairs at Fairgrounds

Montgomery County Board Meeting | Jan. 13, 2026 Article Summary: Recognizing critical infrastructure needs, the County Board voted to donate $30,000 from coal royalty funds to the Montgomery County Fair...

Everyday Economics: The jobs report mirage: Hiring looks fine until revisions hit

By Orphe DivounguyThe Center Square Last week’s jobs report said the U.S. added 130,000 jobs in January. But the more consequential news landed in the fine print: the Bureau of...
This family business paid $200,000 in tariffs last year, but won't cut corners

This family business paid $200,000 in tariffs last year, but won’t cut corners

By Brett RowlandThe Center Square La Tienda has been delivering the best of Spanish cuisine to Americans for three decades, but the task has become more expensive after President Donald...
27 members of TdA, anti-Tren members charged in New York

27 members of TdA, anti-Tren members charged in New York

By Bethany BlankleyThe Center Square An additional 27 members of Venezuelan transnational criminal organizations, Tren de Aragua and its splinter faction, anti-Tren, have been indicted in New York in an...
montgomery county Graphic Logo.4

Montgomery County Board Approves $315,000 for New Dump Truck, Advances Infrastructure Projects

Montgomery County Board Meeting | Jan. 13, 2026 Article Summary: The Montgomery County Board authorized the purchase of a new tandem dump truck and approved several engineering agreements to address road...
Litchfield Brush Fire_5494

Fire Department Responds to Brush Fire

The Litchfield Fire Department responded to a brush fire on 15th Avenue on Friday afternoon. Mutual aid was called for but not needed as crews brought the fire under control....
Illinois Quick Hits: Bills filed to create small business accounts

Illinois Quick Hits: Bills filed to create small business accounts

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Democratic state Sen. Doris Turner, D-Springfield, and Republican state Rep Amy Elik, R-Alton, have filed legislation to...
Taxpayers funding $52.8M Route 9 upgrade; residents raise safety concerns

Taxpayers funding $52.8M Route 9 upgrade; residents raise safety concerns

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Illinois is set to receive $52.8 million in federal taxpayer funding to overhaul roughly 6 miles...
Report: ‘Lawfare’ used to enforce ‘woke’ policies outside legislative process

Report: ‘Lawfare’ used to enforce ‘woke’ policies outside legislative process

By Tate MillerThe Center Square A new report released by Alliance for Consumers shows how the American Left has been pushing its agenda through what it calls “lawfare,” enforcing “woke”...
Climate and energy experts praise Trump’s Endangerment Finding repeal

Climate and energy experts praise Trump’s Endangerment Finding repeal

By Tate MillerThe Center Square Climate and energy experts have praised President Donald Trump’s recent elimination of former President Barack Obama’s Endangerment Finding, with several noting the freedom the action...
Taxpayer group urges Trump, Congress to confront rising federal debt

Taxpayer group urges Trump, Congress to confront rising federal debt

By Tom JoyceThe Center Square A national taxpayer advocacy group is calling on President Donald Trump and Congress to address the nation’s rising debt, warning that interest payments and long-term...
WATCH/EXCLUSIVE: Bill limits governor's emergency powers

WATCH/EXCLUSIVE: Bill limits governor’s emergency powers

By Madeline ShannonThe Center Square The governor’s ability to act unilaterally during states of emergency would be limited, if a new California bill becomes law. Assembly Bill 1835, introduced by...