Litchfield Advances $23 Million Sewer Overhaul and Approves $112,000 in Emergency Water Plant Repairs

Litchfield City Council Meeting | April 2, 2026

Article Summary: The Litchfield City Council moved forward with massive infrastructure planning for its water and wastewater facilities while approving emergency expenditures to address catastrophic failures at the water treatment plant.

Litchfield Infrastructure Key Points:

  • Approved $112,699.03 in emergency repairs for the water plant, including a new PAC silo and security system, waiving competitive bidding.

  • CMT Engineering outlined a $22 to $23 million rehabilitation of the aging wastewater treatment plant, targeting state loans and principal forgiveness.

  • Water clarifiers have been cleaned and filters rebuilt, leading to immediate and noticeable water quality improvements.

  • New 8-inch water lines and a water tower cleaning are underway to address ongoing distribution and quality issues.

The Litchfield City Council on Thursday, April 2, 2026, tackled a series of critical infrastructure hurdles, unanimously approving emergency expenditures for the city’s water treatment plant while previewing a massive $23 million overhaul of the wastewater facility.

The emergency water plant repairs come after what the city’s administration described in agenda documents as a “catastrophic failure of its chemical feed system.” After site visits from both CMT Engineering and HMG Engineering, a voluminous list of immediate corrections was identified.

Alderman Bob Garcia motioned to waive customary bidding procedures to authorize $112,699.03 in emergency fixes. The expenditures include $83,343.00 for a Powered Activated Carbon (PAC) Silo, $4,446.20 for Chlorination and Ammonia Emergency Close Systems, and $24,909.83 for a comprehensive water plant security and access control system to be installed by Heart Technologies.

Christie from CMT Engineering provided an encouraging update on the water plant’s ongoing recovery. A Request for Proposals (RFP) for contract operations is currently out, with vendors touring the facility. Meanwhile, critical deferred maintenance is finally being addressed. Both clarifiers have been completely cleaned out, and the rehabilitation of three filters—comprised of sand and granular activated carbon—is underway.

The results are already visible. “The water after the clarifiers actually had a turbidity that was below the finished water level,” Christie told the council, noting the dramatic reduction of particles in the water. She added that the plant staff’s morale has skyrocketed as they receive proper training on troubleshooting and system functions. “The sense of pride in ownership that’s going on out there is just leaps and bounds from where it was.”

On the distribution side, the city is advancing a $1.5 million water project on the west side of the railroad tracks, funded by a grant, alongside a $2.2 million project to reroute an 8-inch water line on the east side of the lake. A comprehensive cleaning of the water tower is also imminent, which officials hope will further decrease resident complaints regarding water quality.

Simultaneously, the city is racing against the clock to secure funding for a massive overhaul of its wastewater treatment plant, which has reached the end of its extended life. The $22 to $23 million project will heavily focus on replacing deteriorating mechanical components while preserving the structurally sound concrete basins to save costs.

“At a wastewater plant, everything is concrete because the wastewater is corrosive. The structures have like a 50-to-100-year life expectancy. It’s the mechanical components that have that 20-year life expectancy,” Christie explained to the council. “The most economical infrastructure that you have is what you’ve already used and paid for.”

To fund the wastewater overhaul, Litchfield is preparing an application for the State Revolving Fund (SRF) loan program. The city is aggressively pushing to finalize designs and secure necessary construction permits to be placed on the state’s “intended use” list by July 1. Achieving this status is highly competitive but critical, as it opens the door to “principal forgiveness”—the EPA equivalent of grant money based on the city’s median household income.

“We don’t want to lose that principal forgiveness,” Christie emphasized, warning that missing the fiscal cycle could force the city to compete against a different pool of projects the following year with no guarantee of the same financial assistance.

The council will consider an engineering design contract at its next meeting to ensure the project meets the strict state deadlines.

Leave a Comment





Latest News Stories

Litchfield Park-Graphic Logo.4

Dugout Upgrades Stalled, Concession Building Awaits Utilities

Litchfield Park District Meeting | Feb. 4, 2026 Article Summary: The Litchfield Park District Board reviewed facility improvements, including a stalled proposal to upgrade Walton Park dugouts and updates on...
Montgomery County Personnel Committee

County Updates Solar Ordinance and Pursues Renewable Energy Tax Credits

January Committee Meeting Article Summary: The county is revising its solar ordinance to comply with new state laws and has hired a consultant to capture up to $150,000 in tax credits...
Litchfield Logo Graphic.3

Council Amends Sign Ordinance to Comply with First Amendment

Litchfield City Council Meeting | February 19, 2026 Article Summary: To align city code with First Amendment protections, the Litchfield City Council voted to overhaul its regulations on temporary signs....
Montgomery County Bldg Grounds Committee

County Secures $450 Per Acre for Farm Lease, Approves Courthouse Repairs

January Committee Meeting Article Summary: The Buildings & Grounds Committee awarded a lucrative three-year farm lease and approved contracts to restore historic woodwork and repaint the courthouse porch. Buildings & Grounds...
Wynn Lane Fire 02.27.26

Dry Conditions Fuel Rash of Fires Across Region; Litchfield Shed Fire Spreads to 25 Acres

Article Summary: Emergency crews across Montgomery and Macoupin counties were overwhelmed on Tuesday by a series of field and structure fires fueled by dry conditions, including a massive blaze in...
Litchfield Logo Graphic.4

Wildflower Subdivision Final Plat Approved; TIF Impact Explained

Litchfield City Council Meeting | February 19, 2026 Article Summary: The City Council formally approved the final plat and infrastructure bonds for the Wildflower Subdivision on Thursday. During the discussion,...
Montgomery County Finance Committee

Committee Recommends Significant Salary Increase for County Elected Officials

January Committee Meeting Article Summary: The Finance & Budget Committee has recommended setting salaries for the County Clerk, Treasurer, and Circuit Clerk at 60 percent of the State’s Attorney’s salary, which...
Meeting Briefs

Meeting Summary and Briefs: Litchfield Board of Education for February 17, 2026

Litchfield Board of Education Meeting | February 17, 2026 Overall Meeting SummaryThe Litchfield Community Unit School District #12 Board of Education met on Tuesday, February 17, 2026, to address curriculum,...
Litchfield Logo Graphic.4

Former Russell School to Become Wrestling Training Center

Litchfield City Council Meeting | February 19, 2026 Article Summary: The City Council approved a series of zoning changes and a special use permit to allow Purler Wrestling, Inc. to...
Meeting Briefs

Meeting Summary and Briefs: Montgomery County Board for Jan. 13, 2026

Montgomery County Board Meeting | Jan. 13, 2026 Overall Meeting SummaryThe Montgomery County Board’s January meeting was defined by substantial capital spending on highway infrastructure and law enforcement equipment. The...
Litchfield Logo Graphic.3

Council Hires Robert Carpenter as Police Chief in Split Vote

Litchfield City Council Meeting | February 19, 2026 Article Summary: The Litchfield City Council on Thursday voted to hire Robert Carpenter as the new Chief of Police following a comprehensive...
Screenshot 2026-02-18 at 2.33.24 PM

District Pre-Buys Technology to Beat Tariffs, Pays for Major Inspections

Litchfield Board of Education Meeting | February 17, 2026 Article Summary: The Litchfield School Board approved a higher-than-average monthly bill list due to strategic technology purchases and required facility inspections....
montgomery county Graphic Logo.2

Board Considers Property Purchase for Recovery Court Expansion

Montgomery County Board Meeting | Jan. 13, 2026 Article Summary: The board discussed purchasing a property at 127 N. Main Street in Hillsboro to house the Recovery Court, but returned the...
Day after Supreme Court ruling, Trump says he will raise tariffs to 15%

Day after Supreme Court ruling, Trump says he will raise tariffs to 15%

By Dan McCaleb and Brett RowlandThe Center Square President Donald Trump on Saturday said he would raise global tariffs to 15%. The announcement on social media comes a day after...
Advocate: Bipartisan support for IL CO2 pipeline eminent domain prohibition

Advocate: Bipartisan support for IL CO2 pipeline eminent domain prohibition

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – A bipartisan effort is underway to eliminate the option of eminent domain for carbon dioxide pipelines in...