Roads & Bridges Committee Approves Over $120,000 for Local Bridge Infrastructure
Montgomery County Roads and Bridges Committee | March 2026
Article Summary: The Montgomery County Roads and Bridges Committee advanced two major infrastructure repair projects and formalized a road use agreement to facilitate the construction of a new commercial solar farm in Farmersville.
Highway Infrastructure Key Points:
-
The committee recommended a $60,895 engineering agreement with Hurst-Rosche Inc. to replace a bridge in Butler Grove Township.
-
A $60,000 bridge pile repair project on Red Bridge Trail in Hillsboro Township was advanced as a 50/50 cost-share.
-
The committee approved the Elmore Solar Road Use Agreement, granting CF Farmersville Solar construction access along one mile of Main Street.
The Montgomery County Roads and Bridges Committee on Wednesday, March 4, 2026, authorized over $120,000 in collaborative funding to overhaul deteriorating bridge infrastructure across two townships.
County Engineer Cody Greenwood presented the committee with an engineering agreement from Hurst-Rosche Inc. for a comprehensive replacement project on North 15th Avenue in Butler Grove Township. The project will replace an existing wood deck bridge with a new drainage structure, alongside local channel and roadway improvements.
According to the meeting materials, the project’s cost is not to exceed $60,895. The funding will be heavily subsidized, with 80% covered by the Township Bridge Fund and the remaining 20% coming from local funds. Rob Corso made a motion to recommend the engineering agreement, which was seconded by Chad Ruppert and passed unanimously.
The committee also tackled the severely deteriorated bridge on Red Bridge Trail in Hillsboro Township, which is currently closed to traffic. Greenwood presented Resolution 2026-05, appropriating funds for a 50/50 bridge pile repair. The total cost is estimated at $60,000, with Montgomery County and the Hillsboro Township Road District evenly splitting the financial responsibility. Patty Whitworth made a motion, seconded by Bill Bergen, to recommend the resolution and appropriate the funds from the County Aid to Bridge Fund. The motion carried, with Chairman Ethan Murzynski abstaining from the vote.
In a separate action, the committee reviewed and approved the Elmore Solar Road Use Agreement. The document grants CF Farmersville Solar the right to utilize approximately one mile of Main Street (Mine Ave.) to access their proposed solar farm location during construction. The agreement strictly outlines the size and location of the entrance culvert and road, as well as the developer’s responsibilities regarding the use and upkeep of the municipal roadway. Whitworth made a motion to recommend approval of the agreement, which was seconded by Keith Hancock and carried unanimously.
Latest News Stories
Board Doubles Solar and Wind Application Fees, Rejects No-Bid Land Deal
Meeting Summary and Briefs: Litchfield Park District Board for Nov. 5, 2025
Meeting Summary and Briefs: Litchfield City Council for Nov. 6, 2025
Affrunti Resigns as State’s Attorney; Board Appoints Brian Shaw as Successor
City Restructures Finance Department, Hires Consultant and New Coordinator
Trunk or Treat Draws Over 1,000 Attendees
Budget Error Erases Surplus, Creates $920,000 Deficit for Montgomery County
City Clarifies State-Mandated Lead Service Line Letters
Pool Reports $26,500 Loss as District Plans for Repairs
Litchfield Secures Marshalls Department Store with New TIF Agreement
LBI Proposes Expansion of Schalk Field at Park Board Meeting
Litchfield Approves $397k for Emergency Water Plant Repairs; Resident Donates $100k to Cause